Bid Opening for
Collyard
opened the first bid from FDJ’s Construction. Jerry Witt expained
the bids would be presented in two stages, stage 1 would be for the
reconstruction, stage 2 would be for the erosion control.
FDJ’s
stage 1 $57,600.00
FDJ’s
stage 2 $ 6,155.00
Total $63,755.00
The second
bid opened was from Olson Brothers Contractors
Olson
Brothers stage 1 $46,875.00
Olson
Brothers stage 2 $ 6,155.00
Total $53,030.00
Last bid
opened was from Steve Balscik
Balscik
stage 1 $40,876.40
Balscik
stage 2 $ 6,525.00
Total $47,401.40
Motion
(McGee/Porter) to accept the bids from Steve Balscik
as his was the lowest bid. Roll call vote: Porter-yes, Meinke-yes,
McGee-yes, Webb-yes, Collyard-yes. Motion carried.
Motion (Webb/Meinke) to adjourn the meeting of October32, 2006. Motion carried. Meeting was adjourned at